151 South Warner Road has minimal impact on the environment

  • 62% of the existing wall, floor, and roof elements were maintained.
  • The project diverted over 1,200 tons, or over 95%, of onsite generated construction waste from landfills.
  • Over 20% of the total building materials, by value, have been manufactured using recycled materials.

Back to Project

 

 

 

 

151_S_Warner_Rd_Energy